Not listed? Most of what we source never appears online.

Upload a parts list, tender extract or a photo; we read it, you check it, we quote every line.

Catalog at a glance

9463
part numbers listed
2
engine families, 1 manufacturers
2 days
typical quotation turnaround
8 hours, …
since the last catalog update

Downloads and tools

Parts list template for quotations, tender guides, shipment weight calculator.

Simor Industrial Solutions

Unit 30 - 55 Administration Road, Concord, ON L4K 4G9, Canada
+1 (905) 660-3550 · Toll free +1 (855) 222-6555 · [email protected]
Office hours 8:30 to 17:00 Eastern, Monday to Friday.

Trading for more than 20 years. Registered in Canada and Ontario. More than 500 tonnes shipped per year to five continents.

Contact us

Project management and advisory

From overhaul planning to procurement strategy, managed end to end: a defined scope, a sourcing plan, expediting and inspection, and delivery to milestones with one project engineer accountable for the result.

What you receive

  • Project charter: scope, assets, milestones, budget envelope and the decisions that are yours to make.
  • Sourcing plan: every item mapped to a source, lead time and certificate requirement, with alternatives where risk is high.
  • Weekly status report: progress against milestones, open issues, decisions needed, photographs from suppliers and from Concord.
  • Inspection and expediting records at each milestone, and a consolidated document pack at shipment.
  • Close out report with the as delivered list, warranties and the spares recommendation for the next cycle.

How the work runs

  1. Define. A scoping workshop with your operations and procurement leads produces the charter and the milestone plan.
  2. Source. Items are specified and sourced against the plan; long lead items first, with alternatives held in reserve.
  3. Expedite and inspect. Suppliers are followed weekly; goods are inspected against the specification at Concord or at the supplier with photographs.
  4. Deliver. Consolidated shipments on your Incoterm, documents ahead of the goods, and support through installation and commissioning.

1

project engineer accountable per project

Weekly

status report and photographs

2 to 12

months, typical project duration

5

continents delivered to

Projects we manage

Overhaul programmes

Kits, tooling and documentation for a planned overhaul of one unit or a class, phased to your workshop capacity.

Tender and procurement strategy

Technical schedules, supplier qualification, evaluation support and a spares strategy that outlives the tender.

Equipment packages

Multi item packages for a plant or a rig, sourced to datasheet and consolidated for one delivery.

Expediting and inspection

Following suppliers on your behalf, inspecting before dispatch, reporting weekly.

Fleet reliability

Critical spares analysis, obsolescence planning and a standing supply agreement.

Engineered custom orders

Design, assembly and testing of non standard items over the months they take.

Why procurement leads bring us in

The OEM will not engage. Fleets outside the builders' priority markets get long lead times, minimum orders and little technical support. We give the same fleet an engineering literate counterpart in Canada.

The tender needs a technical author. A schedule written by someone who has supplied the parts is answerable, comparable and hard to challenge.

The budget is fixed, the scope is not. A sourcing plan with alternatives lets you keep the programme moving when one item slips.

Nobody owns the whole chain. Between the parts supplier, the freight forwarder and the workshop, things fall through. One project engineer closes the gaps.

Project management and advisory (1) [9dc1074966e5]

A typical programme

  1. 1

    Week 0: charter

    Scope, milestones, decision rights and reporting cadence agreed in writing.

  2. 2

    Weeks 1 to 4: specification and sourcing plan

    Every item specified, sourced and risk rated; long lead orders placed first.

  3. 3

    Weeks 4 onward: expediting

    Weekly supplier follow up, photographs, exception reporting the day an issue appears.

  4. 4

    Milestone shipments

    Inspection, packing, documents ahead of the goods, tracking to site.

  5. 5

    Close out

    As delivered list, warranties, lessons and the next cycle's spares recommendation.

You issue a specification or a schedule of requirements; we return a compliant, line by line quotation in your format with the certificates listed against each item. For frameworks we agree fixed lead time bands, a consolidation cadence and a named counterpart.

Typical buyers: national and regional railways, government tender authorities, EPC contractors.

You send part numbers, a spreadsheet or a photo of the list; we verify, quote within two working days and ship on your Incoterm. Simple courier orders can arrive in one week depending on destination.

Typical buyers: workshops, mines, ports, marine operators, trading houses.

A defined scope with milestones: overhaul kits, a fleet reliability programme, an equipment package for a plant. One project engineer, weekly reports, expediting and inspection built in, invoicing against milestones.

Typical buyers: operators planning an overhaul, EPC procurement leads, asset owners without an OEM contract.

Questions we are asked

How do you charge for project management?

A fixed project fee tied to the charter, invoiced by milestone, separate from the goods. Goods are quoted at the same terms as any direct order.

Can you work with our existing suppliers?

Yes. We expedite and inspect whatever the sourcing plan says, including suppliers you nominate.

Do you supervise installation?

By arrangement, with your workshop or a partner shop. Commissioning support is scoped in the charter where it is needed.

Send the scope, the asset list and the date; we reply with a charter proposal.

Discuss a project

Send us your part numbers

Most of what we source never appears online. Add part numbers to your quote list or upload your document and we will quote every line, listed or not.